+86 311 6906 3883
Suspend the baking wanish cross tee and light-gauge beam to form a grid according to the board specification. Then put the board with the side of no slot on the grid directly. The side with a slot is installed with cross tee.
Copyright © Hebei Ellson Ceilings Industry Co., Ltd All Rights Reserved Sitemap